Sunday, November 16, 2008

Home Theatre Pre-wiring by Rod

Pre-wiring was completed last week and as promised here is the seperate post..
gr8 work done by Rod (& Matt). We are quite happy with all the wiring and excited about all the new gear that will be installed after we move in.

The only sad thing on the day (other than fixing the sound insulation) was Rod jumping off a wobbling ladder and landing his foot on the half brick where he almost dislocated his ankle. Hi ankle bone almost came off but lucky that he could pull it back in place before the ambos came. I am sure that would have been like hell...I am glad that it was not a serious accident....and it didn't happen at my place...also he has to come back to finish my part-2 :)

GET WELL SOON ROD.

Wiring completed for
7.1 setup in theatre
2 wall mounts with central control for all the boxes (foxtel, dvd etc) in the theatre room ... a lot of cables run for this ...
5 x 2 speakers for different rooms (incld alfresco) with volume control knobs and the main control back to the theatre room hub... will buy marantz 7002 which can do a second zone as well.
HDMI cable from study to theatre to stream PC contents + More..


Rod with initial setup..
Media room hub ... all the required gear for HT and other rooms will go here.

Matt taking pics after the final work.

Wednesday, November 12, 2008

A lot happened .. in Weeks 11-14

So much happened in the last 4 week and I didnt have much time to update the blog.
We had bricking almost completed, garage built, some doors installed, ducts for cooling and heating, home theatre pre-wiring by Rod & Matt (seperate post on that soon..) , security system pre-wiring, all electricals pre-wiring.
The insulation & plasters will go next week... Can't wait...
Media room pre-wiring for cieling mount speakers and projector... Sound insulation - Bradford R2.5 for whole of media room including cieling.

Cables..Cables...Cables... So many coz we are installing home audio - cieling mounted speakers in formal lounge, family, dining, kitchen, upstairs and alfresco. I will draw up our setup on our floor plan soon.

This pic taken from across the park (to be built by March 09) from the next street.







Tuesday, October 14, 2008

Double Update (Week-9 & 10)

Roof tiles were laid early this month (around 2nd oct) and today they wrapped up the ground floor...but Garage is still missing (will be up soon where the brick are in the below pic)

Bricks are here... (Austral Homestead mushroom)
Kitchen wrapped up & alfresco area on left
below pic has clear view of alfresco (i.e. outdoor living area) with sliding door entry into family living area... also find the large kitchen window for easy access to/from alfresco area.


Saturday, September 27, 2008

Fascia Gutters and Plumbing (Week-8)

Plumbing work near solar hot water panel...
Roof tiles are delivered...black colour...they should be up in the next... :)

Friday, September 19, 2008

Roof frames & Windows are up...(Week-7)

Full front view (taken from the park)


Main entrance frame fixed...a double door to be added soon...


Regular photo angle update ..


View from inside out at main entrance..


One problem though is our site supervisor has changed...the previous one accepted for home theatre & security pre-wiring and he was pretty cool to deal with..I haven't yet spoken to the new one... I hope he is as good or better...now I have to again ask the new one about pre-wiring etc...

Sunday, September 14, 2008

More frame work on 1st floor..incld Balcony (Week-6)


Guys are getting ready to add the roof frames and tiles..hence the extra protruding frame bits added..



Windows and Door Frames are delivered so they should be up during next week..

Friday, September 5, 2008

Top Floor frame added quite quickly.. (Week-5)

(PS : Note that the house is built on a good height - quite impressed with the work so far)