Sunday, November 16, 2008

Home Theatre Pre-wiring by Rod

Pre-wiring was completed last week and as promised here is the seperate post..
gr8 work done by Rod (& Matt). We are quite happy with all the wiring and excited about all the new gear that will be installed after we move in.

The only sad thing on the day (other than fixing the sound insulation) was Rod jumping off a wobbling ladder and landing his foot on the half brick where he almost dislocated his ankle. Hi ankle bone almost came off but lucky that he could pull it back in place before the ambos came. I am sure that would have been like hell...I am glad that it was not a serious accident....and it didn't happen at my place...also he has to come back to finish my part-2 :)

GET WELL SOON ROD.

Wiring completed for
7.1 setup in theatre
2 wall mounts with central control for all the boxes (foxtel, dvd etc) in the theatre room ... a lot of cables run for this ...
5 x 2 speakers for different rooms (incld alfresco) with volume control knobs and the main control back to the theatre room hub... will buy marantz 7002 which can do a second zone as well.
HDMI cable from study to theatre to stream PC contents + More..


Rod with initial setup..
Media room hub ... all the required gear for HT and other rooms will go here.

Matt taking pics after the final work.

Wednesday, November 12, 2008

A lot happened .. in Weeks 11-14

So much happened in the last 4 week and I didnt have much time to update the blog.
We had bricking almost completed, garage built, some doors installed, ducts for cooling and heating, home theatre pre-wiring by Rod & Matt (seperate post on that soon..) , security system pre-wiring, all electricals pre-wiring.
The insulation & plasters will go next week... Can't wait...
Media room pre-wiring for cieling mount speakers and projector... Sound insulation - Bradford R2.5 for whole of media room including cieling.

Cables..Cables...Cables... So many coz we are installing home audio - cieling mounted speakers in formal lounge, family, dining, kitchen, upstairs and alfresco. I will draw up our setup on our floor plan soon.

This pic taken from across the park (to be built by March 09) from the next street.